| Repair timber frame structure. | |
| Replace 1930’s electrical system. | |
| Upgrade fire protection system and extend to fully cover the structure. | |
| Replace 1980 fire alarm and security system. Restore historic interior wood trim. | |
| Remove asbestos. | |
| Test the structural strength of balconies. | |
| Fully scaffold meeting house interior. | |
| Repair plaster from 1731 and 1755. | |
| Preserve and restore arched wooden 1755 Georgian double windows and 38 diamond-paned windows. | |
| Restore interior floor, repair and restore pulpit and pews. | |
| Repair foundation masonry. | |
| Replace east entrance and door. | |
| Reveal, preserve and protect 1681 exterior door. | |
| Repair clapboard and paint exterior. | |
| Fund ongoing conservation projects. | |
| Contract restoration conservation consultant. | |
| Total: | $950,000 |